Smart IT were approached by ADS – Air Design Systems a construction company based on Team Valley Gateshead. Air Design Systems were first registered in 1993 and has grown year on year resulting in proven partnerships with clients and working on some of the most prestigious projects nationwide.
Based only a 2-minute walk away from Smart IT, ADS felt we would be the perfect IT provider for them.
“Air Design Systems are specialists in the design, installation & commissioning of ventilation systems. Our key areas of business include Smoke Ventilation, Natural Ventilation, Architectural Louvres, Solar Shading / Brise Soleil and Service / Maintenance Contracts.”
Adam Clare, ADS ltd
The Challenge
ADS had acquired a new premises on the Team Valley. After doing renovations to the building ADS found that the new office in its current state wasn’t suitable for their IT infrastructure to be brought in. The wiring around the building was of poor quality as well as areas of the building not having any wiring at all. Having experienced downtime issues in the past ADS knew that from day one they wanted this new venture to go smoothly with as little downtime as possible.
The previous wiring was also poorly managed around the site with wires all over presenting many safety hazards as well as just not looking professional for any clients visiting the building.
“We had previously had major downtime issues with our last office move so we knew Smart IT would be the best option for us to go with this time.”
“Wiring the building properly and looking smart was a priority for the new site. The existing wiring looked unprofessional draped down in corners of the room so I desperately wanted that organising efficiently.”
Adam Clare, ADS ltd
The Solution
David Wilson one of Smart IT’s Account Managers met with ADS at their new premises to gain a better understanding of their building and the infrastructure already in place. After reviewing the site Smart IT were contracted by ADS to install a new line into the building, manage and install cabling around the premises, move and set up their existing server in the new building.
Smart IT also agreed to have an engineer on site and available if any issues were to arise.
Conclusion
Thanks to the time Smart IT had on site before the move day we were able to rewire the building and cable manage using trunking throughout the building to eliminate the ugly wiring ADS were looking to avoid. Once the big move day finally came around ADS were able to move location and set up with only around 2-3 hours of downtime which was to be expected due to the server move and re-installation. Any small issues that occurred on site were fixed quickly thanks to our engineer on site.
Big office moves like this can be stressful for any business no matter the business size. Constant communication before and after the move as well as readily available on site support ensured this move was successful.
“Since the installation we haven’t had any issues. Smart IT made a potentially difficult office move into a stress free process that allowed our business to flourish in our new premises. “ADS would recommend Smart IT for any businesses looking for IT support.”
Adam Clare, ADS Ltd
For information how Smart IT can help with your Office Move contact us today.